• Cost calculation

Order the production of metal items according to the plan

Add drawing

Inserted part

Part parameters

plate / length (A), mm
plates / width (B), mm
plate / thickness (t), mm
Number of anchors
anchor / diameter (d1), mm
anchor / length (L), mm
thread / length, mm
heel / thickness (t1), mm
heel / length (a), mm
heel / width (b), mm
Amount

The cost

0 pcs
0 lei
Unit price
0 lei

Attach a photo / drawing

Select a file

Description

Metal elements installed in the structure before concreting for welding joints of prefabricated and precast monolithic reinforced concrete structures between themselves and with other structures.
Details

Add. comment